by Michael Bell | Aug 2, 2023 | Scrap System
Step 1: Go to the VFD that controls the Scrap Conveyor (DR30) or the Scrap Incline (DR31), both are located in the scrap enclosure and take the front plastic cover off. Use a single strand of ethernet wire (color doesn’t matter) to connect the “DCM”...