269-815-4150 sales@enventek.com

3rd Scrap Drive Information (GS23 Only)

After you have the 3rd VFD installed, powered on and wired up correctly, you will need to program these settings into the VFD using the up down arrows on the VFD itself. Wiring: Aside from the other power wires to and from the fuses and motor please make sure these...